Research Catalog
Human factors evaluation of control room design and operator performance at Three Mile Island-2 : final report
- Title
- Human factors evaluation of control room design and operator performance at Three Mile Island-2 : final report / prepared by T.B. Malone ... [et al.], The Essex Corporation.
- Publication
- Washington : Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission, 1980.
Items in the Library & Off-site
Filter by
1 Item
| Status | Format | Access | Call Number | Item Location |
|---|---|---|---|---|
| Book/text | Request in advance | JSF 81-385 | Offsite |
Details
- Additional Authors
- Description
- 3 v. : ill.; 28 cm.
- Subject
- Note
- "Prepared for Three Mile Island Special Inquiry Group, U.S. Nuclear Regulatory Commission."
- Bibliography (note)
- Includes bibliography.
- Call Number
- JSF 81-385
- OCLC
- NYPG26343819-B
- Title
- Human factors evaluation of control room design and operator performance at Three Mile Island-2 : final report / prepared by T.B. Malone ... [et al.], The Essex Corporation.
- Imprint
- Washington : Available from GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission, 1980.
- Bibliography
- Includes bibliography.
- Added Author
- Malone, T. B.United States. Three Mile Island Special Inquiry Group.Essex Corporation.
- Research Call Number
- JSF 81-385